24th maart 2025, Water off in Building @ 11am
Good morning ladies and gents,
Water will be off for plumbing inspections at 11am for 40 mins.
Thanks,
Evansbuilt, Comino -
28th september 2023, Scaffold Exclusion Zones
Scaffold being dropped around the perimeter of the building - be aware of men working above - stay outside of the exclusion zones.
There will be scaffold stacked up around site.
DO NOT WORK ON ANY SCAFFOLDING - only licensed scaffolders on scaffold
David Wallace - temp Site Manager 0435360093
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 15:21
Temperatuur: 28C (App 30C)
Windsnelheid: 11KM/U
Max. Wind: 20KM/U @13:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: 16C @05:09
Max.temp: 33C @12:58
Windvlaag: 15KM/U
Max. windvlaag: 24KM/U @13:21
Waarneming Locatie - Nambour, QUEENSLAND
Tijdzone - Oost-Australische standaardtijd
Weerbericht - woensdag, 31 december
Shower or two.
Min.: 20C Max.: 29C
Kans op neerslag: 50%
Verwachte regen: 0 tot 4mm
Weerbericht locatie - Nambour, QUEENSLAND
Tijdzone - Oost-Australische standaardtijd
Morgen - donderdag, 1 januari
Shower or two.
Min.: 20C Max.: 27C
Kans op neerslag: 60%
Verwachte regen: 0 tot 7mm
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.